You are here:
  • Operatives
Images per page   24 images found.
Page 1 of 1
Heathrow Airport, T5A (main terminal building), operative takes spirit level reading from steel girder, March 2007.
CHE04032d
Add to lightbox
Heathrow Airport, T5A (main terminal building), operative installs escalator, March 2007.
CHE04031d
Add to lightbox
Heathrow Airport, operatives on ladders planting new foliage for T5 conservation scheme, 08 September 2006.
CHE03956d
Add to lightbox
Heathrow Airport, operatives on ladders planting new foliage for T5 planting scheme, December 2006.
CHE03955d
Add to lightbox
Heathrow Airport, operatives on ladders planting new foliage for T5 planting scheme, 24 June 2006.
CHE03954d
Add to lightbox
Heathrow Airport, operatives on ladders planting new foliage for T5 planting scheme, 25 May 2005.
CHE03953d
Add to lightbox
Terminal 5, Heathrow, operatives painting the interior roof structure of T5A (main terminal building), June 2007.
CHE03859d
Add to lightbox
Terminal 5, Heathrow, operative painting the interior roof structure of T5A (main terminal building), June 2007.
CHE03858d
Add to lightbox
Heathrow Airport, T5 construction site, operative works surface of newly laid airfield concrete behind slip-form paving machine, June 2005.
CHE03812d
Add to lightbox
Heathrow Airport, T5 construction site, slip-form paving machine lays airfield concrete, T5A (main terminal building) in background, June 2005.
CHE03811d
Add to lightbox
Heathrow Airport, T5 construction site, slip-form paving machine lays airfield concrete, June 2005.
CHE03810d
Add to lightbox
Heathrow Airport, T5A main terminal building, operative uses theodolite, May 2005.
CHE03773d
Add to lightbox
Heathrow Airport, operatives walk the banks of the Twin Rivers development, part of T5 conservation scheme, "wavy wall" sound barrier in distance, May 2006.
CHE03656d
Add to lightbox
Heathrow Airport, T5A main terminal building, operative clears rubbish from grass verge, March 2006.
CHE03650d
Add to lightbox
Heathrow Airport, T5B satellite 1, operative on cherry picker paints internal steel structure, 06 July 2006.
CHE03637d
Add to lightbox
Heathrow Airport, Piccadilly line extension tunnel, operatives take track measurements, February 2006.
CHE03624d
Add to lightbox
Heathrow Airport, operative within T5 Heathrow Express train tunnel, 23 November 2005.
CHE03603d
Add to lightbox
Heathrow Airport, T5A main terminal building, operatives on cherry pickers carry out glazing maintenance, 12 July 2006.
CHE03602d
Add to lightbox
Heathrow Airport, T5A, operative carries out work to taxiway in front of main terminal building, September 2005.
CHE03600d
Add to lightbox
Heathrow Airport, T5A, construction of main terminal building, operative stands in interior, May 2006.
CHE03596d
Add to lightbox
Heathrow Airport, operative climbs ladder within T5 Heathrow Express train tunnel, 23 November 2005.
CHE03588d
Add to lightbox
Heathrow Airport, T5A, surveyors use GPS equipment to take measurements, main terminal building in distance, July 2005.
CHE03581d
Add to lightbox
Heathrow Airport, T5A main terminal building, operative applies plaster skim to connecting drywall boards, May 2005.
CHE03580d
Add to lightbox
Heathrow Airport, operative spray painting T5 logo on roundabout, T5A main terminal building in background, July 2005.
CHE03555d
Add to lightbox